August 02, 2018 Meeting Minutes

August 02-2018 Meeting Minutes
August 02, 2018 Meeting Minutes
Date Added: 08/02/2018
Item Update Items
1 General
2 Pershing Park/Sugar Loaf/Bellaire
  • Site survey field work is complete. The design team is starting to utilize the information for laying out the site design.
  • KISD has chosen to move forward with a 3-story design that will be a copy of the East Ward ES building design.
  • Initial concepts for the building and site plans are nearly complete ahead of a planned meeting with KISD leadership next week.
  • Civil has discovered the locations of existing stormwater infrastructure. The information ascertained will allow the detention pond to be deeper which means the footprint will be smaller than originally anticipated.
3 East Ward/West Ward
  • Initial concepts for the building and site plans are nearly complete ahead of a planned meeting with KISD leadership next week.
4 ADA/TAS Improvements (handicap accessibility)
  • Acceessology continues their assessments of campuses in the district. To date, they have field work on 20 campuses complete.
  • Huckabee team has begun the effort in determining design solutions to the deficiencies noted in the assessments and estimating cost for those solutions.
5 Safety and Security
  • The Huckabee design team is working on scope documents for all 45 existing academic campuses to verify the project details with the district.
6 East Ward ES Swing Space
  • KISD is evaluating various options that have been proposed and assessed over the past several weeks in preparation for a presentation to the Board of Trustees that will lay the options out to allow the Board to decide on the optimum direction.
7 ES 36
  • KISD is evaluating options for a potential site for another new elementary school in the district.